Aerospace

Building 401 F-Line Wall

Location: Palmdale, CA
Client: Northrop Grumman
Scope of Work: Constructed a 1,200 lineal foot long, 95′ STC 50 rated Tempest Program separation wall, ICD 705 compliant. The wall construction consisted of 2′ deep spread footing with vertical structural steel support columns. All work was performed inside the Building 401 High Bay implementing risk mitigation best practices while supporting ongoing F-35 business assembly operations.