R5 Roof and HVAC Project
Project Name:
R5 Roof and HVAC Project
Location:
Redondo Beach
Client:
Northrop Grumman
Project Type:
Aerospace Defense
Cost:
$2.2 Million
Scope:
Far West Contractors Corp was awarded Phase 1 and Phase 2 of the RS building re-roof and HVAC upgrade projects. Northrop Grumman's R5 building is a completely secured facility with critical labs and data centers. At no time can power or cooling be shutdown adding to the complexity of the project. To complete this work under these constraints we had to provide temporary cooling units and new power connections so that there was no noticeable effect to the building systems during the seamless transfer to the new equipment. We installed four Temtrol VFD controlled fan wall air handlers with a total combined CFM of 166,400 CFM on new raised mechanical platforms. The air handlers were connected to the existing central plant chilled water system. A new Cleaver Brooks boiler was installed for heating hot water. Two new motor control centers were installed on new equipment platforms as an upgrade to their aging electrical distribution system. A new natural gas emergency power backup generator was installed to back up one of their critical labs. Besides the new HVAC equipment we removed the existing failing roofing system and installed 47,168 ft.² of new Tremco built up roofing. The entire project was completed on schedule without any disruption to the Northrop employees occupying the building.
Contact Us

Please send us an email and we'll get back to you asap.