M1 EPS Lab
  • Overall Control Room Progress
  • Lab SW High
  • Lab East High
  •  Overall Control Room Progress
  • Overall Lab Progress 5.1
  • Crane Install
  • AHU 20 Ductwork
  • Process Cooling Water System
  • UG Elect Rough 2ns phase, Formwork and Rebar Footings and Pads
  • Slab and Trench Wall Pour
  • Compressed Air System
  • Process Cooling Water System
  • slab2 High Pours
Project Name:
M1 EPS Lab
Location:
Redondo Beach, California
Client:
Northrop Grumman
Project Type:
Aerospace Defense
Cost:
$2.6 million
Scope:
Provide Design/Build services to relocate the EPS Lab from building 202 in El Segundo to building M1 at Space Park. Project consisting of Sound Proof Engine Run up lab, new 5 ton crane and footings, utility trenches, compressed air and cooling water, Roof Top Platform and HVAC. Control room with sound and shatterproof glass and raised flooring.